Real Soccer Lake stadium |
|
| The stadium of Real Salt Lake soccer team was completed in 2008 and houses 20,000 seats. Shortening erection time had major importance: thanks to the application of BRB system the construction was finished in less than 10 months. This fast construction and the reduced amount of steel material led to a cost saving of $1 million (9.1% of total costs) from which $250,000 is directly related to the use of BRBF instead of conventional braced frames. | |
| watch gallery |